What this work involves
Assess moisture, cracks and movement. Discuss colour variation, movement joints, protection and time before use.
- Material and surface
- Substrate and joint layout
- Loading and maintenance
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Keep assessed causes and inspection points accessible when applying new finishes.
What the drawing needs to explain
Create a defect map with photographs, locations and investigation questions. Include inspection access and the intended drainage path in the repair proposal.
How to review the result
Check the repair and future access together. Ask which signs deserve attention at the next inspection and where the relevant documentation is stored.
Cost factors for this service
Costs depend on area, system build-up, substrate repairs and finish. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for poured & seamless floor finishes. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging poured & seamless floor finishes?
A seamless appearance does not mean all structural joints can be removed. The necessary joint layout belongs in the flooring design.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

