What this work involves
Start with a final kitchen installation drawing. Then establish which walls, floors and connections change. This avoids furniture that does not fit or inaccessible services.
- Removal of the existing kitchen
- Layout and wall changes
- Water, drainage, electrics and ventilation
- Floor and wall finishes
- Measuring, delivery and installation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Include concealed-defect investigations before finalising renovation scope.
Decide this before construction
Assess the cause first, then establish the repair extent. Record concealed work before applying finishes and keep agreed inspection points clear.
Which trade-off matters?
Completely concealing a junction may look attractive but make later inspection harder. Compare a closed finish with a solution keeping vulnerable points accessible.
Compare the complete intervention
Separate investigation, necessary repairs and improved access. Identify uncertainties in concealed areas, with an agreed decision point after opening them.
Cost factors for this service
Building preparation is often separate from the kitchen price. Include service changes and repairs to adjacent surfaces.
Bring this to the discussion
Kitchen design, installation drawing, dimensions and photographs.
Questions about the work
When should the kitchen be measured?
Agree this with the supplier. After building changes, final measuring may need to wait until the relevant dimensions are reliable.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.